Event Platform RFP: the six tests to run before you sign (or switch)

Planning an event platform RFP? Discover the six tests to run before you sign, a timeline built from your contract renewal, and RFP questions you can copy.

Schedule a demo
Event Platform RFP: the six tests to run before you sign (or switch)

An event platform RFP is supposed to make a complex decision simple. You list your requirements, send them to a shortlist, compare the answers and choose. In practice, most organisers who have run one describe something else: a spreadsheet of several hundred lines where every vendor answered "yes", a set of polished demos that all looked alike, and a decision that was postponed because nobody felt sure.

The instinct is to make the RFP longer and more detailed. More requirements, more scoring, more columns. It rarely produces more certainty, because a written "yes" costs a vendor nothing, and a demo built on someone else's data tells you very little about how the platform will behave with yours.

This guide proposes a different structure. An event platform RFP should be built around tests, not answers: six checks you run on your own flows, your own data and your own timeline before you sign, or before you switch from the platform you already have. The written questionnaire still matters, but as the starting point of the evaluation, not its conclusion.

What is an event platform RFP?

An event platform RFP (request for proposal) is a structured document an organiser sends to potential technology partners to describe the events they run, the functions they need and the conditions of the contract, and to receive comparable proposals in return. It is used for trade shows, congresses, association meetings and corporate events, and it typically covers registration, matchmaking, the event app, exhibitor tools, integrations, data protection, support and price.

For organisers who already have a platform, the RFP is usually triggered by the approach of a contract renewal. That makes it a replacement decision as much as a selection decision, and the cost of switching becomes part of what you are evaluating.

RFI, RFP and demo: what is the difference?

A request for information (RFI) is a short, open document that helps you understand who is on the market and build a shortlist. An RFP is the formal request, sent to that shortlist, with detailed requirements and a request for price.

A demo is the vendor's presentation of the product. The common mistake is to treat the demo as the test. A demo shows what the platform can do in the vendor's hands; the six tests below show what it does in yours.

What makes a good event platform RFP?

A good RFP is not the most detailed one. It is the one that produces answers you can verify. (For the features themselves, see our complete guide to choosing a trade show management system.) Five characteristics separate a useful RFP from a long one:

  • It describes your flows, not a feature list: how a visitor, an exhibitor or a hosted buyer moves from invitation to badge to meeting at your event, step by step.
  • It weights requirements: a handful are deal-breakers, many are preferences. Without weights, a platform that answers yes to everything scores higher than one that does your critical five perfectly.
  • It asks for evidence, not assertions: a configuration on a test environment, a reference with a comparable event, a sample export.
  • It prices the switch: migration, integration, training and the period in which two systems run side by side, not only the annual licence.
  • It names the decision makers: who evaluates, who signs and who can veto, so that the people who must be convinced are in the room at the right time.

Why event platform evaluations stall: the platform nobody could try

Organisers we work with consistently describe the same moment: the shortlist is down to two, both demos went well, and the decision does not come. In one evaluation we took part in, the client postponed the decision not because a function was missing but because their team had not been able to test the platform on a realistic environment, with enough exhibitors, products and sessions to recognise their own event in it. Several other prospects have asked us, unprompted, for exactly that kind of data-rich environment.

The pattern makes sense. A written answer cannot tell you how many clicks your operations manager needs to approve a buyer, or what happens when a registration code arrives from a ticketing flow nobody mapped. Only a test can. When the evaluation offers no test, the safest option for the person deciding is to wait, or to stay with the platform they already know.

The second reason is structural. Across the demos we have analysed, in the large majority of cases the person evaluating the platform is not the person who signs. If the decision maker meets the platform only through a summary, the evaluation has to be repeated at the worst possible moment: just before the deadline.

When to start: a timeline built backwards from your contract renewal

The calendar of a platform decision is set by the renewal date of your current contract, not by the date of your next event. Starting from the event date is the most common reason evaluations end in a rushed extension of the existing contract. Working backwards from renewal, a realistic timeline looks like this:

WhenWhat happensOutput
12 months before renewalReview the current platform: what works, what is missing, what you cannot afford to loseList of deal-breakers and of data to preserve
9-10 months beforeRFI to the market, shortlist of three or four partnersShortlist and RFP draft
7-8 months beforeRFP sent, demos run on your flows, reference calls scheduledComparable proposals
5-6 months beforeThe six tests on the two finalists, decision makers involvedDecision and contract
3-4 months beforeMigration plan, integrations built, team trained, pilot event or edition chosenPlatform ready, two systems overlapping if needed

If your next large event falls inside that window, plan the migration around a smaller pilot event first. A platform change tested on the flagship show is a risk you do not need to take.

The six tests to run before you sign

These six tests turn an event platform RFP from a comparison of promises into a comparison of evidence. Each one answers a question the questionnaire cannot.

1. Run your own flow, not theirs. Before the demo, send each finalist a simple flowchart of your process: invitation, database import, registration, approval, badge, check-in, meeting, report. Ask them to show that sequence, with your categories of user, rather than their standard tour. In one demo we ran, the module that answered the client's real need only came up after more than forty minutes, and only because the client asked for it. A demo built on your flow puts it on screen in the first ten.

2. Test the integration with your systems, and find out who does the work. Integration with ticketing, CRM and access control is the real technical gate of almost every evaluation. Ask each partner to describe the integration with your actual systems and to state who builds it. Some partners provide open APIs and expect your own suppliers to connect to them; others, LetzFair among them, integrate their platform into your systems themselves. The difference shows up months later, in who you call when the synchronisation breaks.

3. Classify every "yes". A yes in an RFP can mean four different things: it exists and you can see it; it exists but was not in the demo environment; it is in development with a date; or it does not exist but could be built under a specific agreement. Ask the vendor to label each answer accordingly. A function that "can be developed" is not a function you have, especially if you have to decide in three weeks.

4. Book the reference call early. A conversation with an organiser who runs a comparable event on the platform is the strongest evidence available, and the easiest to obtain. Ask for it at the RFP stage, not after the shortlist, so that it does not become the bottleneck in the final week. Ask the reference what went wrong in their first edition, not only what went right.

5. Test the exit before the entrance. Ask for a sample export of attendee, exhibitor and meeting data in a usable format, and for the contractual position on data ownership. You should be the data controller, with the platform acting as processor on your instructions, including for behavioural data. The ease of leaving is a good predictor of how a partner will behave while you stay. (For the specific questions to ask about matchmaking algorithms, read our guide on evaluating AI matchmaking vendors.)

6. Price the switch, not just the licence. Ask each finalist to quote the full first year: licence, setup, integrations, mobile app if separate, training and any period of parallel running. Then add your own internal cost: the hours your team will spend learning a new tool in the months before a show. The cheapest licence is often not the cheapest decision.

Switching event platforms: what to ask before you migrate

When you already have a platform, the question is rarely whether the alternative is better. It is how much changing will cost you, and what you might lose on the way. The best opening question in a migration conversation is not "what are you missing today?" but "what can you not afford to lose?"

  • History: which data from previous editions will be imported, in what form, and whether exhibitor and visitor profiles carry over to future editions and events.
  • Coexistence: whether the old and new platforms can run side by side for a period, so that one show migrates while another stays where it is.
  • A pilot: which smaller event will go first, and what "success" means for it before the flagship moves.
  • Configuration speed: how long it takes to set up a new show once the first one is live. In one large organiser we work with, configuring an additional show on the platform takes a day or two.
  • Retraining: who on your team needs training, when they have time for it in the event calendar, and what documentation stays with you if that person changes role.

RFP questions you can copy

The table below collects the questions that most often separate a convincing answer from a generic one. Use it as a section of your RFP, and ask vendors to answer in the "good answer" format.

AreaQuestionWhat a good answer looks like
FlowsShow our invitation-to-meeting flow with our user categoriesA live walkthrough of your sequence, not a standard tour
IntegrationWho builds and maintains the integration with our ticketing and CRM?A named owner, a timeline and a fallback if a sync fails
Feature statusFor each requirement: exists, exists but not shown, in development (date), or buildable under agreement?Every answer labelled, not just "yes"
Data ownershipWho is controller and processor, and can we export everything, including behavioural data?You are controller; full export in a documented format
SecurityWhere is data hosted, how is it encrypted, how often is the platform tested?Hosting region, encryption standard, frequency of independent tests
AdoptionWhat adoption do comparable events reach, measured against what?A figure with its denominator stated
ReferencesCan we speak to an organiser who runs a comparable event?A call scheduled within the RFP period
MigrationWhat do we keep from previous editions, and can two platforms coexist?A written migration plan with a pilot event
CostWhat is the total first-year cost, and what disappears from year two?Licence and one-off costs separated

Why feature-by-feature comparison fails

The arithmetic explains most stalled evaluations. A detailed RFP easily reaches a hundred requirements; with four vendors that is four hundred answers, almost all of them "yes", to be read by a team that is also running events. Scoring them produces a ranking that reflects how generously each vendor interpreted the questions, not how well the platform fits.

A checklist brought by the client feature by feature against their incumbent is a sign of the same problem. It feels rigorous, but it measures parity, and parity is not a reason to change. What decides a switch is whether the new platform does your critical flows better and costs less to live with, which is exactly what the six tests measure and a spreadsheet cannot.

LetzFair's approach: evaluations you can verify

We take part in many evaluations, and we have learned more from the ones that stalled than from the ones we won. The way we run an evaluation follows from that.

Bring your flow, not ours

We ask organisers to share their process and their questions before the demo, and for complex projects we run a longer session with a break and time for questions sent in advance. The aim is that the client recognises their own event on screen, not ours. Demo access as an attendee and as an exhibitor lets the team try the experience from the user's side.

We do the integration work

LetzFair is built API-first and integrates with the ticketing, CRM and registration systems an organiser already uses rather than replacing them. In the HostMilano case study, integration with Salesforce and the ticketing system kept participant data synchronised in real time for an event with 2,100+ exhibitors and 180,000+ attendees. The principle is that the integration is our job, not something we hand over to your other suppliers.

Four kinds of answer, stated openly

When a requirement comes up, we say which of the four categories it falls into: available, available but not in the demo environment, in development with a date, or a deliberate product choice we will not make. Organisers have told us they value that distinction more than a long list of yeses, because it lets them plan.

Your data stays yours

The organiser is the data controller and LetzFair acts as processor, including for behavioural data collected on the platform. Data is encrypted with AES-256 and hosted in EU data centres, and the platform undergoes penetration testing twice a year. Exhibitors can export only the contacts they actually scanned or interacted with, because that is where real consent exists.

Continuity across editions

Profiles persist between editions and across the events of the same organiser, so moving a portfolio onto the platform builds history rather than resetting it every year. That is also what makes a pilot event useful: what you learn on the first show carries over to the next.

The best event platform RFP is the one that makes the answers testable

An RFP that collects four hundred yeses does not reduce risk; it hides it. The evaluations that end in a confident decision are the ones that start early enough, put the decision makers in the room, and replace assertions with tests on the organiser's own flows and data.

Start twelve months before renewal, ask what you cannot afford to lose, and run the six tests on your finalists. If a partner cannot pass them before you sign, the platform will not pass them after.

Evaluating a new platform or preparing to switch? Bring us your flow and see it run on LetzFair's event platform, from registration and integrations to meetings and reporting.

Frequently asked questions

What should an event platform RFP include?

A description of your events and user flows, weighted requirements, integration needs with your existing systems, data protection and security requirements, support expectations, migration needs if you already have a platform, and a request for the full first-year cost.

How long does it take to choose an event platform?

Plan for around twelve months from the first review to go-live when you are replacing an existing platform, working backwards from the renewal date of your current contract. A first platform for a single event can be faster, but integrations and training still need several months.

How many vendors should receive an event platform RFP?

Three or four is usually enough. More than that multiplies the answers to read without improving the decision, and makes it harder to run meaningful tests on the finalists.

What questions should you ask an event technology vendor?

Ask who builds the integrations, which of their "yes" answers exist today, who owns the data and how you export it, where data is hosted and how it is tested, what adoption comparable events reach and against what denominator, and whether you can speak to a reference with a similar event.

How do you switch event platforms without losing data?

List the data you cannot afford to lose before the RFP, ask each finalist for a written migration plan, request a sample export from your current platform early, and move a smaller pilot event first while the flagship stays on the existing system.

Should you ask for a test environment during an event platform evaluation?

Yes, and ideally one populated with enough exhibitors, products and sessions for your team to recognise their own event. A demo shows what the platform can do in the vendor's hands; a test shows how it behaves in yours.

Keep reading

Other articles

View all articles

/Newsletter

Event insights, straight to your inbox

Trends, practical guides and LetzFair product news for organizers of trade shows, conferences and corporate events.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

No spam. Unsubscribe with one click at any time.

Have a project waiting to become reality? Talk to us.

  • B/Open
  • Luxottica
  • Jointly
  • DiDays
  • Fiera Milano
  • Vinitaly
  • Veronafiere
  • ART-ER

Contact us

About you
Your company

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

No spam. We only use your details to contact you about your demo.